The walls are painted. The ceiling paneling is installed and painted. The floor planks are installed, treated and sealed. We have yet to replace any trim – no window trim, no door trim, no baseboards, no trim around the paneling, no threshold pieces.
Ethan’s light fixture is installed, Rachel’s is not yet.
Headboards for both beds are together.
Tomorrow: assemble beds, install Rachel’s light fixture. Kids home Wednesday.
There are rainbows on my 11 year old son’s wall from his gaudy, sparkly Canadian Tire chandelier. He is going to love it and I am slightly jealous.
Leave a Reply